复杂电子组件变批量智能动态排产调度方法
DOI:
CSTR:
作者:
作者单位:

1.北京信息科技大学机电工程学院北京100192;2.北京信息科技大学高端装备智能感知与控制北京市 国际科技合作基地北京100192;3.北京信息科技大学现代测控技术教育部重点实验室北京100192; 4.中国机械科学研究总院集团北京100048

作者简介:

通讯作者:

中图分类号:

TH23; TN06

基金项目:

北京市自然科学基金(L258043)项目资助


Intelligent dynamic scheduling method for variable-batch production of complex electronic assemblies
Author:
Affiliation:

1.School of Mechanical and Electrical Engineering, Beijing Information Science & Technology University, Beijing 100192, China; 2.Beijing International Science and Technology Cooperation Base for Intelligent Perception and Control of High end Equipment, Beijing Information Science & Technology University, Beijing 100192, China; 3.Key Laboratory of Modern Measurement & Control Technology, Ministry of Education, Beijing Information Science & Technology University, Beijing 100192, China; 4.China Academy of Machinery Science and Technology, Beijing 100048, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在高端电子制造领域,企业年初计划排产常因多品种、变批量、高复杂度项目并行而面临全局资源冲突与交付风险,传统人工分块排产效率低且可行性差。为此,提出一种面向多品种变批量电子组件的智能排产调度方法。该方法以遗传算法(genetic algorithm,GA)为核心,构建“静态排产—瓶颈识别—动态扩能—重调度”闭环框架:首次以全体项目加权差期总和最小化为目标,契合交付导向的管理需求;显式建模分批流同步调度逻辑,通过工序拆批、批次间隔与整批齐套机制,真实反映实际生产过程;采用工艺顺序与周期系数相结合的双段式编码生成可行解,并引入子空间优化缓解大规模问题的早熟收敛;同时,自动识别超期项目及瓶颈资源,依企业能力对可扩资源实施有限动态扩能,并通过迭代重调度保障按期交付。基于某电子制造企业实际数据验证表明,该方法将超期项目数量超期率由50.47%降至24.30%,整体生产周期压缩30.9%,有效消除了资源冲突并显著提升了交付精准性。

    Abstract:

    In the high-end electronics manufacturing sector, annual production planning at the beginning of the year is frequently challenged by global resource conflicts and delivery risks due to the concurrent execution of multi-variety, variable-batch, and highly complex projects. Traditional manual block-based scheduling approaches suffer from low efficiency and poor feasibility. To address these issues, this paper proposes an intelligent scheduling methodology tailored for multi-variety, variable-batch production of electronic assemblies. Centered on a genetic algorithm, the method establishes a closed-loop framework encompassing static scheduling, bottleneck identification, dynamic capacity expansion, and rescheduling. Initially, it minimizes the total weighted tardiness across all projects, aligning with delivery-oriented management objectives. The model explicitly captures the synchronized scheduling logic of batch-split flows by incorporating operations splitting, inter-batch intervals, and full-kit batch constraints, thereby faithfully reflecting real-world production dynamics. A two-segment encoding scheme—integrating process sequence and cycle-time coefficients—is employed to generate feasible solutions, complemented by a subspace optimization strategy to mitigate premature convergence in large-scale instances. Furthermore, the approach automatically identifies overdue projects and bottleneck resources, and—within enterprise-defined limits—dynamically expands eligible capacities before triggering iterative rescheduling to ensure on-time delivery. Validation using real-world data at an electronics manufacturing enterprise demonstrates that the proposed method reduces the number of overdue projects, lowering the overdue rate from 50.47% to 24.30%,and compresses the overall production cycle by 30.9%, effectively eliminating resource conflicts and significantly enhancing delivery precision.

    参考文献
    相似文献
    引证文献
引用本文

周明阳,王红军,何山,黄申晖,王海燕.复杂电子组件变批量智能动态排产调度方法[J].电子测量与仪器学报,2026,40(9):222-232

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2026-11-13
  • 出版日期:
文章二维码
×
《电子测量与仪器学报》
关于防范虚假编辑部邮件的郑重公告