变频电机绝缘局放电压自动测试系统设计
DOI:
CSTR:
作者:
作者单位:

四川大学

作者简介:

通讯作者:

中图分类号:

基金项目:

国家自然科学基金项目(面上项目,重点项目,重大项目)


Design of an Automatic Test System for Partial Discharge Voltage of Inverter-fed Motor Insulation
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    国际电工技术委员会国际标准要求在重复脉冲电压下,对变频电机绝缘进行局部放电起始放电电压(PDIV)和局部放电熄灭电压(PDEV)测试。本研究结合二维机械滑台、特高频测试技术、高频脉冲电源系统、高速宽带数据采集和微型控制技术,设计一种用于重复脉冲电压下变频电机绝缘PDIV与PDEV多路自动测试系统,可准确、高效测试变频电机绝缘PDIV与PDEV。最后,利用此系统进行不同上升时间重复脉冲下变频电机匝间绝缘绞线对试样的PDIV与PDEV测试,实验结果发现当重复脉冲电压上升时间小于100 ns时,产生的过电压会显著影响PDIV与PDEV测试结果,与预期结果一致,验证了系统的可靠性。

    Abstract:

    PDIV and PDEV of inverter-fed motor insulation under repetitive impulsive voltages should be measured according to the standards released by the International Electrotechnical Commission (IEC). A multi-channel automatic test system for that was designed by using a two-dimensional mechanical sliding table, UHF testing technology, a high-frequency pulse power supply system, high-speed broadband data acquisition device and micro-control technology, which can accurately and efficiently measure the PDIV and PDEV of inverter-fed motor insulation. Finally, PDIV and PDEV of the twisted pair samples of inverter-fed motor insulation under repetitive pulse voltage with different rise time were tested based on this system. It was found that the overvoltage caused by the short rise time affected the PDIV and PDEV test results significantly when the rise time is shorter than 100 ns. The overvoltage at the rise and fall time of the repetitive square wave voltages could be the main cause of different PDIV and PDEV results at impulsive voltages with short rise times, which were consistent with the expected results and verified the reliability of the system.

    参考文献
    相似文献
    引证文献
引用本文
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2019-03-20
  • 最后修改日期:2019-06-06
  • 录用日期:2019-06-11
  • 在线发布日期:
  • 出版日期:
文章二维码
×
《电子测量与仪器学报》
关于防范虚假编辑部邮件的郑重公告