Prediction and analysis of surface settlement around subway open cut station under multi monitoring conditions
DOI:
CSTR:
Author:
Affiliation:

1 CSCEC Dongshe Geotechnical Engineering Co., Ltd., Shenyang 110000; 2 China Architecture northeast design and Research Institute Co., Ltd., Shenyang 110000; 3 Liaoning geotechnical and underground space engineering technology research center, Shenyang 110000

Clc Number:

TB22

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the measured data of a subway open cut station, the main factors affecting the surface settlement around the foundation pit of the subway station are discussed, analyzed and predicted. Firstly, correlation analysis is used to obtain the correlation degree of various monitoring data and correlation parameters; Secondly, the nonlinear regression model is established by multi-element fitting regression analysis to analyze the law of surface settlement and predict the settlement; Finally, the measured data of open cut deep foundation pit of a subway station are used for experiment and result inspection. After inspection, it is found that the maximum error between the predicted value and the measured value is 0.273mm, and the predicted settlement trend is completely consistent with the measured settlement trend, indicating that the method is feasible.in order to reduce the observation frequency of surface settlement, reduce the workload, more scientifically understand the causes of surface settlement and enrich the prevention strategies.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 17,2024
  • Published:
Article QR Code